
Repainting the Tower Bridge Arches
Contractors removing the defective Top Coat and repainting the Arches on the North and South Towers.

Contractors removing the defective Top Coat and repainting the Arches on the North and South Towers.

Both of the ALPS Space Frame platforms have now been raised into place on the west walkway.
A short video showing Tower Bridge at night and the two cradles. The Port of London Authority by-laws require that a bundle of straw by
A short video showing specialist painting contractors repainting the East Walkway on Tower Bridge. Repainting the high-level walkways will take approximately five months to complete.


42 metres above the River Thames, the walkways provide stunning views of the city and many famous London sites.

42 metres above the River Thames, specailist contractors have erected Side Access Platforms to each side of the East Walkway.
A video showing the Silver Cloud cruise ship passing through Tower Bridge on 2nd August 2010 at 7.30pm. Since launching in 1994, the Silver Cloud
This video clip from the 27th July 2010 shows a needle gun being used to remove defective coatings from around the rivet joints under the
Images by Harris Digital Productions
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.