
At night on Tower Bridge
A short video showing the two ALPS Space Frame Platforms under the West Walkway, specialist contractors moving the mobile elevating work platforms (speeded up) across Tower Bridge

A short video showing the two ALPS Space Frame Platforms under the West Walkway, specialist contractors moving the mobile elevating work platforms (speeded up) across Tower Bridge

During the night-time bridge closures, the bascules were raised to facilitate the painting of areas inaccessible when the Bridge is in its down position.

Just before we set-up for the first night-time closure, we capture Tower Bridge and some party goers cruising on the River Thames.

A short video showing multi-disciplined high access technicians inspecting the stonework and pointing on the South Abutment Arch of Tower Bridge.

High access technicians inspect the stonework and pointing on the South Abutment Arch of Tower Bridge.

This video shows specialist painting contractors applying the final touches to the West Walkway.

Inside one of the ALPS Space Frame platforms, specialist painting contractors are removing the defective Top Coat from under the West Walkway of Tower Bridge.
During the night-time road closures, specialist painting contractors removed the defective Top Coat and repainted the Bascule nosings with modified epoxy paint.
A short video showing specialist contractors restoring and repainting the Tower Bridge Arches during the night-time closure. The new paintwork, which has a life expectancy of
Images by Harris Digital Productions
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.