
The Walkways
42 metres above the River Thames, the walkways provide stunning views of the city and many famous London sites.

42 metres above the River Thames, the walkways provide stunning views of the city and many famous London sites.

All four Suspension Chains have now been repainted using a state-of the-art high-performance coating system.

The current ongoing restoration work on Tower Bridge involves the removal of all earlier layers of paint in order to ensure the complete adherence of the new paint.

ENVIROWRAP is a polyethylene shrinkwrap material. It is heat-applied to the scaffold structure and forms a taut bonded cladding façade.
Images by Harris Digital Productions
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.