
The Tower Bridge Bascules
During the night-time bridge closures, the bascules were raised to facilitate the painting of areas inaccessible when the Bridge is in its down position.

During the night-time bridge closures, the bascules were raised to facilitate the painting of areas inaccessible when the Bridge is in its down position.

During the night-time road closures, specialist painting contractors continue repainting the Arches on the North and South Towers.

The first ALPS Space Frame platform (cradle) under the West Walkway has been dismantled on Tower Bridge.

Just before we set-up for the first night-time closure, we capture Tower Bridge and some party goers cruising on the River Thames.

A short video showing multi-disciplined high access technicians inspecting the stonework and pointing on the South Abutment Arch of Tower Bridge.

High access technicians inspect the stonework and pointing on the South Abutment Arch of Tower Bridge.

This video shows specialist painting contractors applying the final touches to the West Walkway.

Specialist painting contractors have nearly finished repainting the West Walkway.

Inside one of the ALPS Space Frame platforms, specialist painting contractors are removing the defective Top Coat.
Images by Harris Digital Productions
Harris Digital Productions was commissioned by the City of London to record the restoration and repainting of Tower Bridge. This website is dedicated to the restoration work which took place during 2008-2011.