Work starts on the East Walkway

Painting contractors start work on the East Walkway of Tower Bridge.

External Cross Bracing with defective Top Coat removed. Awaiting final sanding.
Steve, removing the defective Top Coat.

About Us

This website is dedicated to the restoration of Tower Bridge, which took place during 2008-2011.

Recent Posts